1.

The symbol given below represents __________(a) Water meter(b) Water machine(c) Washing machine(d) Wash meterI had been asked this question in exam.I'd like to ask this question from Building Plans topic in portion Building Plans, PERT and CPM of Construction & Building Materials

Answer»

The correct choice is (a) Water meter

The explanation is: The SYMBOL given above represents a water meter. Water meter is an INSTRUMENT which is USED for measuring the volume of water used by commercial and RESIDENTIAL buildings.

2.

In bar charts, which colour is used to show the actual progress?(a) Red(b) Black(c) Blue(d) GreenI have been asked this question in an online quiz.My doubt stems from PERT and CPM topic in chapter Building Plans, PERT and CPM of Construction & Building Materials

Answer» RIGHT answer is (d) Green

Easiest explanation: In bar charts, different colours are sometimes filled in the bars for showing VARIOUS control information. For ACTUAL progress, green colour is used. For anticipated progress, black colour is used and for progress behind SCHEDULE, red colour is used.
3.

The full form of CPM is ___________(a) Critical Path Method(b) Control Path Method(c) Critical Plan Management(d) Control Path ManagementThe question was asked in an interview.Asked question is from PERT and CPM in portion Building Plans, PERT and CPM of Construction & Building Materials

Answer»

Right choice is (a) CRITICAL Path Method

Easy explanation: The full FORM of CPM is the Critical Path Method. CPM networks are mainly used for those PROJECTS for which a FAIRLY accurate estimate of time of completion can be made for each ACTIVITY.

4.

Bar charts were modified later to obtain the milestone charts.(a) True(b) FalseI have been asked this question in an interview.The above asked question is from PERT and CPM in division Building Plans, PERT and CPM of Construction & Building Materials

Answer»

The CORRECT choice is (a) True

Best EXPLANATION: The various tools or techniques used for project management are bar CHARTS, milestone charts and network diagrams. Bar charts were modified LATER to obtain the milestone charts.

5.

Which of the following is not a phase of project management?(a) Project planning(b) Project scheduling(c) Project controlling(d) Project beingI have been asked this question in an internship interview.Question is taken from PERT and CPM in chapter Building Plans, PERT and CPM of Construction & Building Materials

Answer»

The CORRECT choice is (d) Project being

Easiest explanation: There are THREE phases of project MANAGEMENT. These are project planning, project scheduling and project controlling. Project management refers to a highly specialised job to ACHIEVE the objectives of a project.

6.

The symbols A and B represent _______ and _______ respectively.(a) Generator, ammeter(b) Gauge, ammeter(c) Generator, alarm(d) Gauge, alarmThe question was asked by my school principal while I was bunking the class.My question is based upon Building Plans topic in portion Building Plans, PERT and CPM of Construction & Building Materials

Answer»

Correct answer is (a) GENERATOR, ammeter

Explanation: The symbol A REPRESENTS generator and symbol B represents ammeter. An ammeter is an instrument which is used for MEASURING the CURRENT.

7.

The shortest possible time in which an activity can be achieved under ideal circumstances is known as ________(a) Pessimistic time estimate(b) Optimistic time estimate(c) Expected time estimate(d) The most likely time estimateI had been asked this question by my school teacher while I was bunking the class.I need to ask this question from PERT and CPM topic in section Building Plans, PERT and CPM of Construction & Building Materials

Answer» CORRECT choice is (b) OPTIMISTIC time estimate

To ELABORATE: There are THREE kinds of time estimates made by PERT planners. These are the optimistic time estimate, the PESSIMISTIC time estimate and the most likely time estimate. The shortest possible time in which an activity can be achieved under ideal circumstances is known as the optimistic time estimate.
8.

Windows and almirahs cannot be represented on a plan if it is cut at the plinth level.(a) True(b) FalseThe question was asked in quiz.The doubt is from Building Plans in division Building Plans, PERT and CPM of Construction & Building Materials

Answer»

Right CHOICE is (a) True

To explain: Windows and almirahs cannot be represented on a PLAN if it is CUT at the plinth LEVEL. This is because windows and almirahs have their SILL level higher than the plinth level.

9.

The difference between the maximum time available and the actual time needed to perform an activity is known as _________(a) Free float(b) Independent float(c) Total float(d) Half floatI got this question at a job interview.I would like to ask this question from PERT and CPM in chapter Building Plans, PERT and CPM of Construction & Building Materials

Answer»

Correct ANSWER is (c) Total float

To EXPLAIN: The difference between the maximum time available and the ACTUAL time needed to PERFORM an activity is KNOWN as the total float. Hence, the total float is the excess of the maximum available time throughout the time of the activity.

10.

The symbol given below represents __________(a) Ceiling fan(b) Bracket fan(c) Exhaust fan(d) Fan regulatorThe question was posed to me in unit test.Question is taken from Building Plans topic in portion Building Plans, PERT and CPM of Construction & Building Materials

Answer»

Right ANSWER is (c) Exhaust FAN

The explanation: There are different symbols USED to represent different types of fans on a plan of a building such as CEILING fan, bracket fan, exhaust fan, ETC. The above symbol represents an exhaust fan.

11.

The symbol given below represents __________(a) Washbasin(b) Plain kitchen sink(c) Refrigerator(d) Rectangular bathThe question was asked in an international level competition.My question is based upon Building Plans in chapter Building Plans, PERT and CPM of Construction & Building Materials

Answer»

Correct option is (b) PLAIN kitchen sink

Explanation: Symbols are ALSO USED to represent various sanitary items that are commonly used in buildings. The SYMBOL given above REPRESENTS a plain kitchen sink.

12.

In a network, a critical path is the time-wise shortest path.(a) True(b) FalseThis question was addressed to me in an interview for internship.The question is from PERT and CPM topic in portion Building Plans, PERT and CPM of Construction & Building Materials

Answer»

The CORRECT option is (B) False

Explanation: In a NETWORK, a critical path is the time-wise longest path. The critical path in the Critical Path METHOD plays an essential role in scheduling and planning.

13.

Who introduced the bar charts?(a) Williams henry(b) Henry Gantt(c) Jane Gantt(d) Joseph henryThis question was addressed to me in an online quiz.I need to ask this question from PERT and CPM in division Building Plans, PERT and CPM of Construction & Building Materials

Answer»

Correct ANSWER is (B) HENRY Gantt

To elaborate: Henry Gantt introduced the bar charts around 1900 A.D. They give PICTORIAL representation in two dimensions of a project by breaking it down into numerous manageable units.

14.

Which of the following types of plans is the plan at the roof level?(a) Foundation plan(b) Floor plan(c) Terrace plan(d) Structural plan of a typical floorI got this question by my school principal while I was bunking the class.Query is from Building Plans topic in division Building Plans, PERT and CPM of Construction & Building Materials

Answer»

Correct option is (C) Terrace PLAN

For explanation: There are VARIOUS types of plans to represent a building. These are a typical floor plan, terrace plan, FOUNDATION plan and structural plan of a typical floor. The plan at the roof level is the terrace plan.

15.

The full form of PERT is ___________(a) Program Evaluation and Rate Technology(b) Program Evaluation and Robot Technique(c) Program Evaluation and Robot Technology(d) Program Evaluation and Review TechniqueThis question was addressed to me in an internship interview.This interesting question is from PERT and CPM topic in portion Building Plans, PERT and CPM of Construction & Building Materials

Answer»

Right option is (d) Program Evaluation and Review Technique

The explanation is: There are various NETWORK techniques that are called by various names LIKE PERT, CPM, TOPS and LESS. Network technique is one of the major advancements in management science. The FULL FORM of PERT is Program Evaluation and Review Technique.

16.

_________ are used to represent activity in a network diagram.(a) Circles(b) Squares(c) Rectangles(d) ArrowsThis question was posed to me during an internship interview.Enquiry is from PERT and CPM topic in section Building Plans, PERT and CPM of Construction & Building Materials

Answer»

Right ANSWER is (d) Arrows

Explanation: A network is a FLOW diagram that consists of events and activities which are CONNECTED sequentially and logically. Arrows are used to REPRESENT activity in a network diagram. Events are generally represented by circles.

17.

The symbol given below represents ________(a) Refrigerator(b) Fire hydrant(c) Fire hose(d) Flush hoseI have been asked this question in an interview.This interesting question is from Building Plans in division Building Plans, PERT and CPM of Construction & Building Materials

Answer»

Right CHOICE is (B) Fire hydrant

To explain I would say: The symbol GIVEN above represents fire hydrant. A fire hydrant is USED by firefighters to supply water for fighting FIRES.

18.

The symbols A and B represent _________ and ________ respectively.(a) Indian type water closet, washbasin(b) Western-style water closet, washbasin(c) Western-style water closet, Indian type water closet(d) Indian type water closet, western-style water closetI had been asked this question during an interview.I would like to ask this question from Building Plans topic in portion Building Plans, PERT and CPM of Construction & Building Materials

Answer»

Correct option is (d) Indian TYPE water closet, western-style water closet

The best I can EXPLAIN: The two TYPES of water closets mainly used are Indian type water closet and Western-style water closet. The SYMBOL A given above REPRESENTS Indian type water closet. The symbol B represents the Western-style water closet.

19.

The symbols marked A and B represent ___________ and ___________ respectively.(a) Plaster, glass(b) Glass, plaster(c) Wood, plaster(d) Wood, soilThe question was asked in my homework.My doubt is from Building Plans topic in division Building Plans, PERT and CPM of Construction & Building Materials

Answer» CORRECT CHOICE is (a) Plaster, glass

Best EXPLANATION: The SYMBOL marked A represents plaster and plaster products. The symbol marked B represents glass.
20.

A foundation plan depicts the details of different types of foundations provided for the building.(a) True(b) FalseThe question was asked by my college professor while I was bunking the class.My query is from Building Plans topic in chapter Building Plans, PERT and CPM of Construction & Building Materials

Answer»

Correct answer is (a) True

Easiest explanation: A FOUNDATION plan depicts the details of different types of FOUNDATIONS provided for the building. The VARIOUS types of foundations which a building may contain are spread FOOTING for walls, STRAP footing for two columns, raft foundation for a group of columns etc.

21.

The given symbol represents __________(a) Heater(b) Electric bell(c) Lamp(d) Tower railI have been asked this question in homework.My enquiry is from Building Plans in section Building Plans, PERT and CPM of Construction & Building Materials

Answer»

The correct OPTION is (b) Electric bell

The best I can explain: The SYMBOL given above represents an electric bell. An electric bell is a mechanical bell which is widely used in telephones, FIRE alarms, ETC.

22.

A PERT network is activity-oriented while a CPM network is event-oriented.(a) True(b) FalseThe question was asked in exam.This key question is from PERT and CPM topic in division Building Plans, PERT and CPM of Construction & Building Materials

Answer»

Right ANSWER is (B) False

The best explanation: A CPM network is ACTIVITY-oriented while a PERT network is event-oriented. Event is the completion of an activity or the commencement of an activity. An event may be head event, TAIL event or dual role event.

23.

The symbol shown below represents __________(a) Bricks and brick masonry(b) Stone and stone masonry(c) Cement concrete(d) WoodI had been asked this question by my school teacher while I was bunking the class.Origin of the question is Building Plans topic in chapter Building Plans, PERT and CPM of Construction & Building Materials

Answer» CORRECT choice is (a) Bricks and brick MASONRY

Explanation: The symbol shown above represents bricks and brick masonry. The SYMBOLS are an EASY WAY to depict the materials used for building constructions on a plan.
24.

According to the time estimates made by the PERT planners, the maximum time that would be needed to complete an activity is called as __________(a) The most likely time estimate(b) Optimistic time estimate(c) Pessimistic time estimate(d) Expected time estimateThis question was addressed to me in a job interview.This interesting question is from PERT and CPM topic in division Building Plans, PERT and CPM of Construction & Building Materials

Answer»

Right choice is (c) Pessimistic TIME estimate

Explanation: According to the time ESTIMATES made by the PERT planners, the MAXIMUM time that would be needed to complete an activity is called the pessimistic time estimate. This estimate does not include POSSIBLE effects of floods, earthquakes, etc.

25.

A plan is conventionally cut at the _______(a) Roof level(b) Floor level(c) Plinth level(d) Window sill levelI have been asked this question in class test.The query is from Building Plans topic in section Building Plans, PERT and CPM of Construction & Building Materials

Answer»

Right option is (d) WINDOW sill level

Explanation: A plan is CONVENTIONALLY cut at the window sill level. It is a graphical representation of a building represented by the PLANE of a PAPER.

26.

The symbol given below represents __________(a) Sliding door(b) Revolving door(c) Stairs(d) WindowI have been asked this question in an online interview.My query is from Building Plans topic in division Building Plans, PERT and CPM of Construction & Building Materials

Answer»

Right option is (B) Revolving door

To elaborate: There are various types of doors which can be REPRESENTED on a plan USING SYMBOLS such as sliding door, revolving door etc. The symbol GIVEN above represents a revolving door.

27.

Symbols given below represent __________(a) Single leaf, single swing door and double leaf, double swing door(b) Single leaf, double swing door and double leaf, double swing door(c) Double leaf, single swing door and single leaf, single swing door(d) Single leaf, single swing door and single leaf, double swing doorThe question was asked during an interview.Question is from Building Plans in section Building Plans, PERT and CPM of Construction & Building Materials

Answer»

Right choice is (d) Single LEAF, single swing DOOR and single leaf, DOUBLE swing door

For explanation I would say: Symbols are USED to REPRESENT various construction elements in a building. ‘A’ represents single leaf, single swing door and ‘B’ represents single leaf, double swing door.

28.

The full form of BIS is _________(a) Board of Indian Standards(b) Bureau of Indian Standards(c) Bureau of International Specifications(d) Board of International StandardsI got this question in unit test.My doubt is from Building Plans in division Building Plans, PERT and CPM of Construction & Building Materials

Answer»

Right OPTION is (b) Bureau of Indian Standards

For explanation I would say: The full form of BIS is the Bureau of Indian Standards. The CONVENTIONAL symbols used in building drawings are STANDARDISED by BIS are followed NATIONALLY as well as internationally.