| 1. |
According to the time estimates made by the PERT planners, the maximum time that would be needed to complete an activity is called as __________(a) The most likely time estimate(b) Optimistic time estimate(c) Pessimistic time estimate(d) Expected time estimateThis question was addressed to me in a job interview.This interesting question is from PERT and CPM topic in division Building Plans, PERT and CPM of Construction & Building Materials |
|
Answer» Right choice is (c) Pessimistic TIME estimate |
|