Saved Bookmarks
| 1. |
Which of the following data is not required to prepare an estimate?(a) Amplitude(b) Drawings(c) Specifications(d) RatesThis question was posed to me in an internship interview.I'm obligated to ask this question of Types of Estimates topic in chapter Rate Analysis, Estimation and Costing of Construction & Building Materials |
|
Answer» RIGHT option is (a) Amplitude The BEST explanation: For preparing an estimate, data such as drawings, detailed specifications, rates, ETC. is required. The drawings needed to prepare the estimate include plans, sections, ELEVATIONS, etc. |
|