| 1. |
In earthwork calculations, the average horizontal distance between the centre of deposition and the centre of excavation is known as ___________(a) Lift(b) Flooring(c) Lead(d) EmbankmentThe question was asked in semester exam.Origin of the question is Estimation and Costing topic in chapter Rate Analysis, Estimation and Costing of Construction & Building Materials |
|
Answer» The correct ANSWER is (c) Lead |
|