Identify the missing data.(a) Riser(b) Swinger arm(c) Header(d) HeadI got this question during an online interview.I would like to ask this question from Deep Excavations in section Deep Excavations, Pile Foundations and Caisson of Construction & Building Materials

Answer»

Right CHOICE is (a) Riser

For explanation I WOULD say: A Riser is a vertical PIPE driven in the ground. The well point is provided at the bottom end of the riser. The diameter of the Riser is about 40 mm to 50 mm.