| 1. |
Which line, starting from the left takes care of all the openings provided in the wall?(a) Line 4(b) Line 6(c) Line 7(d) Line 8The question was posed to me in a job interview.I need to ask this question from Structural Design of Walls topic in division Load Bearing Walls of Construction & Building Materials |
|
Answer» CORRECT option is (b) Line 6 The explanation: Starting from the left, line 6 TAKES care of all the OPENINGS provided in the WALL. These openings can be provided for doors, windows, ventilators, etc. |
|