Saved Bookmarks
| 1. |
In __________ method, the surface of RCC slab is kept rough and on this surface a layer of concrete is laid.(a) Mastic Asphalt(b) Finishing(c) Bedding Concrete(d) FinishingI have been asked this question in an online quiz.Question is from Water Leakage topic in section Damp Proofing, Water Proofing and Termite Proofing of Construction & Building Materials |
|
Answer» The correct answer is (c) Bedding Concrete |
|