1.

What Is Period Of Responsibility And Time Logic?

Answer»

All the relationships in the OM have a validity period. These validity periods for performing tasks are known as period of RESPONSIBILITY, which either starts before the current date or ENDS in the past. Time LOGIC determines whether the authorization CHECK should be performed on a date-dependent basis (from T582A-VALDT) or not. If the period of responsibility is empty, then the time logic RETURNS not authorized.

All the relationships in the OM have a validity period. These validity periods for performing tasks are known as period of responsibility, which either starts before the current date or ends in the past. Time logic determines whether the authorization check should be performed on a date-dependent basis (from T582A-VALDT) or not. If the period of responsibility is empty, then the time logic returns not authorized.



Discussion

No Comment Found