1.

Which is not the essential quality of a good surveyor?(a) The quality surveyor must be well versed with the drawings of work(b) He should be able to read the drawing correctly and bill the quantities accurately(c) He  should  have a thorough  knowledge  of  the  construction  procedure  to  be adopted, the various items of works involved in the execution and the different materials to be used in the work(d) Oral representation of schedule to be priced by tenderor

Answer» Correct choice is (d) Oral representation of schedule to be priced by tenderor

Explanation: He should be able to prepare written schedule to be priced by tenderor for better understanding, for future proof, easy in showing the work to multiple people etc.