The open circuits test on a transformer is performed is badciall y to determine |
|
Answer» open Circuit Test The purpose of the open-circuit test is to DETERMINE the no-load current and losses of the transformer because of which their no-load parameters are determined. This test is PERFORMED on the PRIMARY WINDING of the transformerhope it helps you buddy:) |
|