Saved Bookmarks
| 1. |
Q. A can plough a field in 12 hour while B takes 16 hour to plough the same field. if they work together What portion of field they will plough in 1 hour ? How long will both of them take together to Plough the field? |
|
Answer» Answer: 10 men plough a field in 7 DAYS 1 men can plough a field in (7×10)=70 days 14 men plough a field in (70/14)= 5 days So the REQUIRED no. of days is 5। |
|