1.

Manju, who works at Ganesh Fruit juice center, prepares 51 glasses of milkshake in 4 min, 18 sec in his first shift. After having a sandwich, he prepares 73 glasses in 7 min 13 sec. After another sandwich, he prepares 112 glasses in 12 min, 24 sec. The container in which the milkshake is prepared contains a maximum of 9 glasses of a drink at a time. The approximate average time (to the nearest integer) of preparation of one container of the drink, if he starts with a fresh container each time is (in seconds) ___

Answer» Manju, who works at Ganesh Fruit juice center, prepares 51 glasses of milkshake in 4 min, 18 sec in his first shift. After having a sandwich, he prepares 73 glasses in 7 min 13 sec. After another sandwich, he prepares 112 glasses in 12 min, 24 sec. The container in which the milkshake is prepared contains a maximum of 9 glasses of a drink at a time. The approximate average time (to the nearest integer) of preparation of one container of the drink, if he starts with a fresh container each time is (in seconds) ___


Discussion

No Comment Found

Related InterviewSolutions