1.

Infrastructural details of country Normans Land. - Maximum possible electricity production in aear (in kwh) = Generating capacity in kw × number if hours in a year - Capacity utilization % =Actual electricity productionMaximum possible electricity production× 100 If efficiency of power production is defined as . 85 × capacity utilization, then what was the efficiency in 1985(approximately).

Answer»

Infrastructural details of country Normans Land.

- Maximum possible electricity production in aear (in kwh) = Generating capacity in kw × number if hours in a year
- Capacity utilization % =Actual electricity productionMaximum possible electricity production× 100

If efficiency of power production is defined as . 85 × capacity utilization, then what was the efficiency in 1985(approximately).