Saved Bookmarks
| 1. |
If M and N together can complete a piece of work in 4 days and N takes twice as much days taken by M to complete the work alone, in how many days does M alone complete the whole work? 1. 6 days2. 4 days3. 10 days4. 12 days |
||||||||||||||||
|
Answer» Correct Answer - Option 1 : 6 days Given: M and N together can do a piece of work = 4 days. N takes twice as much days alone as taken by M to complete the same piece of work. Concepts used: Total work = LCM Efficiency = Work/Time Calculation: Let the number of days taken by M to complete the piece of work alone be 'a' days. So, time taken by N alone to complete the work = 2a days Total work = LCM of 'a' and '2a' = 2a
Time = Total work/Efficiency ⇒ 4 = 2a/3 ⇒ a = 12/2 days ⇒ a = 6 days Time taken by M to complete the work alone = a days = 6 days. ∴ M takes 6 days alone to complete a piece of work. |
|||||||||||||||||