1.

if 22 men can dig 13(1/2) metre long canal in a day , how many men should be employed for digging 20(1/4) metre long canal of the same type in one day​

Answer»

ANSWER:

ANSWER

11 MEN dig 6

4

3

mt=

4

27

mt in one day

⇒ 1 MAN can dig =

4×11

27

=

44

27

mt in one day

∴ 27 metre can be dug by (

27

44

×27) men in one day

⇒ 27 metre long trench of the same type can be dug by 44 men in one day.



Discussion

No Comment Found

Related InterviewSolutions