Saved Bookmarks
| 1. |
If 12 men can do a job in 7 days, what fraction of the job can be done by one man in one day?1. \( {1\over 14}\)2. \({7\over 12}\)3. \({1\over 84}\)4. \({1 \over 72}\) |
|
Answer» Correct Answer - Option 3 : \({1\over 84}\) Given: 12 men can complete a job in 7 days Formula used: (Men1 × days1 × hours1)/work1 = (Men2 × days2 × hours2)/work2 Calculation: Let w be the work done by 1 man in one day (12 × 7)/1 = (1 × 1)/ w ⇒ 84 = 1/w ⇒ w = 1/84 ∴ One man can do 1/84 part of job in one day |
|