Saved Bookmarks
| 1. |
How would you best describe a Sprint Review? |
|
Answer» It is when the Scrum TEAM and stakeholders inspect the outcome of a Sprint and figure out what to do next. Every event in Scrum, besides the Sprint which is a container for the other EVENTS, is an opportunity to Inspect and Adapt. A Sprint Review is CONDUCTED at the end of the Sprint to inspect the increment and adapt the product backlog if required. During this, the Scrum Team and Stakeholders collaborate about what was done in the Sprint and figure out any changes to be done to the product backlog during the Sprint to optimize value. TYPICALLY, this meeting is a form of the DEMO of the new features. |
|