How To Insert An Inspection Checkpoint At The End Of An Operation? |
|
Answer» If in process SAMPLE is to be defined, assign inspection type 03 in the Material Master. Then CREATE MICs and assign them in the Routings. System AUTOMATICALLY GENERATES the Inspection Lots If in process sample is to be defined, assign inspection type 03 in the Material Master. Then create MICs and assign them in the Routings. System automatically generates the Inspection Lots |
|