How Are Scrap Costs Shows In The Standard Cost Estimate?

Answer»

Scrap COSTS are assigned to the RELEVANT cost component and can be SHOWN separately for a MATERIAL in the costed multilevel BOM.

Scrap costs are assigned to the relevant cost component and can be shown separately for a material in the costed multilevel BOM.