Saved Bookmarks
| 1. |
How Are Scrap Costs Shows In The Standard Cost Estimate? |
|
Answer» Scrap COSTS are assigned to the RELEVANT cost component and can be SHOWN separately for a MATERIAL in the costed multilevel BOM. Scrap costs are assigned to the relevant cost component and can be shown separately for a material in the costed multilevel BOM. |
|