1.

Following offsets were taken from a survey line to a hedge:Distance (in m)051015203040Offsets (in m)345.55644.5The area between survey line and the hedge is (by trapezoidal method):

Answer»

Following offsets were taken from a survey line to a hedge:
























Distance (in m)051015203040
Offsets (in m)345.55644.5



The area between survey line and the hedge is (by trapezoidal method):


Discussion

No Comment Found