Saved Bookmarks
| 1. |
Following offsets were taken from a survey line to a hedge:Distance (in m)051015203040Offsets (in m)345.55644.5The area between survey line and the hedge is (by trapezoidal method): |
||||||||||||||||
|
Answer» Following offsets were taken from a survey line to a hedge:
The area between survey line and the hedge is (by trapezoidal method): |
|||||||||||||||||