1.

Estimation cost provided for water supply and electrification is __________(a) 4% and 6%(b) 18% and 18%(c) 08% and 08%(d) 12% and 15%

Answer» The correct choice is (c) 08% and 08%

For explanation I would say: Pipes must be installed to meet requirements for durability, safety and thermal performance-

• contractor responsibilities

• general installation requirements

• where to lay pipework

• access for maintenance and replacement

• preventing electric shock

• pipe insulation.