|
Answer» A takes 10 days less than time TAKEN by B to finish piece of work so, A = B - 10.......(1)
let take X as time taken to finish a piece of work by B = x then A = x-10
one day work of A, A= 1/(x-10) one day work of B, B = 1/x
A and B work together to finish a job in 12 days so, A+B = 12
one day work of A and B A+B = 1/12..........(2)
substitute A and B in (2) 1/(x-10) + 1/x = 1/12 (x+x-10)/(x*(x-10)) = 1/12 (2x - 10)*12 = x²-10x 24x - 120 = x²-10x x²-10x-24x+120 = 0 x²-34x+120 = 0 x²-4x-30x+120 = 0 x(x-4)-30(x-4) = 0 (x-4)(x-30) = 0 x= 4,30
B finish a job in x= 4 days is not possible because A and B work together for 12 days so B time taken to finish a should be greater than 12
so B finish the job in x=30 days
A finish the same job in x-10 = 30-10 = 20 days
to check WHETHER A=20, B=30
one days work of A and B together,
A+B = 1/20+1/30 A+B = (30+20)/600 A+B = 50/600 A+B = 1/12
time taken to finish whole work of A and B together
A+B = 12
|