1.

A steel box has dimensions of 3 m, 2 m and 0.5 m. It has to be gold plated through electrolysis. If each square metre of gold plating costs ₹ 100, then gold plating the outer surface of the box costs ______.

Answer»

A steel box has dimensions of 3 m, 2 m and 0.5 m. It has to be gold plated through electrolysis. If each square metre of gold plating costs ₹ 100, then gold plating the outer surface of the box costs ______.




Discussion

No Comment Found