Saved Bookmarks
| 1. |
A steel box has dimensions of 3 m, 2 m and 0.5 m. It has to be gold plated through electrolysis. If each square metre of gold plating costs ₹ 100, then gold plating the outer surface of the box costs ______. |
|
Answer» A steel box has dimensions of 3 m, 2 m and 0.5 m. It has to be gold plated through electrolysis. If each square metre of gold plating costs ₹ 100, then gold plating the outer surface of the box costs ______. |
|