A small terrace at a football ground comprises 15 steps each of which is 50 m long and built of solid concrete.Each step has a rise of 4/1m and a tread of 2/1m. Calculate the total volume of concrete required to build the terrace.[Hint : Volume of concrete required to bulid the first step =14×12×50m3] |
|
Answer» A small terrace at a football ground comprises 15 steps each of which is 50 m long and built of solid concrete. Each step has a rise of 4/1m and a tread of 2/1m. Calculate the total volume of concrete required to build the terrace. [Hint : Volume of concrete required to bulid the first step =14×12×50m3] ![]() |
|