1.

a man pulls a bucket full of water from h metre well. If the mass of rope is m and mass of bucket full of water is M ,then the work done by the man is 1) (M/2+m)gh 2) (M+m)/2 3) (M+m/2)gh 4) (M+m)gh

Answer» a man pulls a bucket full of water from h metre well. If the mass of rope is m and mass of bucket full of water is M ,then the work done by the man is
1) (M/2+m)gh 2) (M+m)/2 3) (M+m/2)gh 4) (M+m)gh


Discussion

No Comment Found

Related InterviewSolutions