Saved Bookmarks
| 1. |
A can finish a work in 36 months, B in 18 months and C in 24 months. B and C start the work but are forced to leave after 4 months. The remaining work was done by A in: |
|
Answer» A can finish a work in 36 months, B in 18 months and C in 24 months. B and C start the work but are forced to leave after 4 months. The remaining work was done by A in:
|
|