| 1. |
A can do a piece of work in 14 days while B can do it in 21 days. They began together and worked at it for 6 days. Then, A fell ill and B had to complete the remaining work alone. In how many days was the work completed? |
|
Answer» Number of days A required do a piece of work : 14 days Number of days B required do a piece of work : 21 days Work done by A in one day: \(\frac{1}{14}\) Work done by B in one day: \(\frac{1}{21}\) Work done by A and B together in one day: \(\frac{1}{14}+\frac{1}{21}=\frac{5}{42}\) They can do the work together in \(\frac{42}{5}\) days . A and B worked together for 6 days, so work completed by A and B in 6 days : 6 x \(\frac{5}{42}=\frac{5}{7}\) Work left = \(1-\frac{5}{7}=\frac{2}{7}\) Number of days taken by B to complete the left over work : \(\frac{2}{7}\times21\) = 6 6 ( here 21 is days required by B to complete a piece of work). ∴ Time taken to finish the work: 6 + 6 = 12 days. ∴ Total time taken to finish the work: 12 days |
|