1.

 A can complete a work in x days and B can complete the same work in 15 days. Find out how many days will they take together to complete the work if A is 75% efficient of B.1. 152. 20/33. 60/74. 13

Answer» Correct Answer - Option 3 : 60/7

Given :

A can do a work in ‘x’ days

B can do the work in 15 days

The efficiency of ‘A’ is 75% of the efficiency of ‘B’

Concept used :

The efficiency of a person × Number of days he took to complete the work = Total Work

Number of days to complete the work = Total work/Work done every day

Calculations:

Let the working efficiency of B be ‘b’

Let the working efficiency of A be ‘a’

Work for A = Work for B

The efficiency of A × x = Efficiency of B × 15    

⇒ a × x = b × 15

⇒ 75% of b × x = b × 15

⇒ (3/4) b × x = b × 15

⇒ x = 20 days

Now, total work = LCM of 20 and 15 = 60 units

A’s per day work = (Total work/Total days he took) = 60/20

⇒ 3 units

B’s per day work = 60/15

⇒ 4 units

A and B total work for everyday = 4 + 3 = 7 units

Total number of days taken by them = Total work/work done by them every day

⇒ 60/7

∴ They both will complete the work in 60/7 days 