Saved Bookmarks
| 1. |
A bucket filled with water weighing 20 kg is raised from a well of depth 20m. If the lineat density of the rope is 0.2 kg per meter, the amount of work done is, (g=10 ms^(-2)) |
| Answer» Answer :C | |