1.

A and B working together can mow field in 56 days and with the help of C they could have mowed it in 42 days how long would c take by himself

Answer»

A and B take 56 DAYS

1 DAY = 1/56


A and B + c take 42

⇒ 1 day = 1/42


If c does it by himself:

⇒ 1 day = 1/42 - 1/56 = 1/168


Number of days NEEDED for c to do it by himself = 168 days


Answer: 168 days