|
Answer» A and B can do a piece of work in 10 days so, A+B = 10 one day work of A and B A+B = 1/10.............(1)
B and C can do it in 15 days so, B + C = 15 one day work of B and C is B+C = 1/15..............(2)
A and C can do it in 20 days so, A+C = 20 one day work of A and C is A+C = 1/20...........(3)
sum all three EQUATIONS (1), (2), (3) (A+B) + (B+C) + (A+C) = (1/10)+(1+15)+(1/20) 2A + 2B + 2C = (1/5)((1/2)+(1/3)+(1/4)) 2(A+B+C) = (1/5)((6+4+3)/12) 2(A+B+C) = 13/60 A+B+C = 13/120..............(4)
substitute (1) in (4) (1/10) + C = 13/120 C = (13/120) - (1/10) C = (13-12)/120 C = 1/120 one day work of C is 1/120
whole work DONE by C in 120 days
#mark as brainliest
|