Saved Bookmarks
| 1. |
300 kg of water are lifted 10 m vertically in 5 s.show that the work done is 30 KJ and that the power is 6 KW. |
|
Answer» Answer: Work done= m ×g× h so W= 300×10×10= 30000 J or 30 KJ And Power= Work done/time taken so P=30000/5=6000W Or 6KW |
|