11 men can dig 27/4 meter long trench in one day .how many man should be employed for digging 27 meter long tranch some type in one day |
|
Answer» Answer: Number of men NEEDED to DIG 27 - meter TRENCH = 44 Step-by-step explanation: 11 men can dig 27/4metre in one day men should be employed for digging 27 metres =X Now 11 : x = 27/4 : 27 PRODUCT of externals = product of internal i.e.,11 × 27 = X x 27/4 297 = 27 x/4 297 x 4 = 27x 1188=27x x =1188/27 = 44 therefore men should be employed=44 Hope it helps plzzzzzz mark me as brain list |
|