11 men can dig 27/4 meter long trench in one day .how many man should be employed for digging 27 meter long tranch some type in one day​

Answer»

Answer: Number of men NEEDED to DIG 27 - meter TRENCH = 44

Step-by-step explanation:

11 men can dig 27/4metre in one day

men should be employed for digging 27 metres =X

Now 11 : x = 27/4 : 27

PRODUCT of externals = product of internal i.e.,11 × 27 = X x 27/4

297 = 27 x/4

297 x 4 = 27x

1188=27x

x =1188/27 = 44

therefore men should be employed=44